One could question my sanity, however, I drive through 4 construction sites on my 10 minute drive to work. I don't do highways, don't need to. I guess this is obvious, but do all construction projects start up at exactly the same time in the spring? They all sat dormant over the winter. I just wonder how the staffing works? Do all the workers get laid off in November and rehired in May?
I would think that since these are the only 4 intersections that I go through to get to work, that after they are done (well after I move from this area probably), there should be zero going on in that stretch of road.
I am a pollyanna. One of them has been going on for 6 years, stalled for 3 of that. The end of our street has been under construction for over a year, the Trapelo Road for at least 3 years and the Totten Pond, Winter street is the 6 year one
Gotta love a short commute, and the business of construction.
1 comment:
There's no telling. The Winter Street Exit off 128 Southbound has been under continuous construction since we moved here in September 2000. That may just be its natural state.
Post a Comment